This is a long time, compare this with the Chernobyl scenario, the following is an excerpt from the IAEA: "Under extremely hazardous conditions, thousands of "Liquidators" worked to contain the remains of the fourth reactor. The shelter surrounding the reactor was completed less than six months after the explosion during peak radioactivity levels. The massive concrete and steel "Sarcophagus", quickly constructed using "arms length" methods, has deteriorated over the years, creating a potentially hazardous situation. Several repairs were made to the current shelter, including the stabilisation of the ventilation stack and reinforcement of the roof. In addition, a plan for the construction of a more secure and permanent structure to be built around the existing Sarcophagus was drafted; work has already begun on the infrastructure of this new shelter. The plan, called the Shelter Implementation Plan, is a project of the Chernobyl Shelter Fund. Both efforts, whose combined expected expenditures over the next eight or nine years exceed $765 million, are administered by the European Bank for Reconstruction and Development."
Also in order to keep cooling the spent fuel and the 3 breached reactors water must be injected continually, and water will always find its way into the ocean. From the latest entries on Fukushima in Wikipedia: "Reports of 13 observations of neutron beams 1.5 km "southwest of the plant's No. 1 and 2 reactors" from 13 March to 16 March raised the possibility that nuclear fission could have occurred after the initial SCRAMing of the reactors at Fukushima Daiichi. "
Welcome!
A blog interested in the truth, however uncomfortable it might be.
No comments:
Post a Comment